• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • signin
  •  Cart ()
Search Malaysian Standard (MS)
 Advanced Search Search




Urban stormwater management - Part 15: Pipe Drains
MS 2526-15:2014
Status : Original
Format : PDF

This Malaysian Standard specifies design and planning criteria of the stormwater pipe drain systems or storm sewers. It will enable the drainage facilities for urban areas to be designed cost-economic ....Read more ally with least danger and inconvenience to the public from flooding and from service maintenance requirements. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 19: Gate and pump
MS 2526-19:2014
Status : Original
Format : PDF

This Malaysian Standard specifies design acceptance criteria for stormwater gates and pumping station facilities. It does not detail out criteria and required facilities which are associated with sto ....Read more rmwater quantity and quality control management as well as the derivation of design flow hydrographs. These are specified in other parts. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 18: Culvert
MS 2526-18:2014
Status : Original
Format : PDF

This Malaysian Standard specifies design and planning criteria for culverts; which can avert some common problems with culvert design and construction like overtopping, erosion of embankments, siltati ....Read more on, upstream ponding and debris control. It will also avoid the culvert from being inadequate (to carry the designed discharge), unsafe and costly. It does not cover details of hydraulic design or the range of product types available in the market. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 14: Drains and swales
MS 2526-14:2014
Status : Original
Format : PDF

This Malaysian Standard specifies criteria for the design of open drainage systems including structures and composite drains and swales. Maximum depths, side slopes and reserve requirements are also s ....Read more pecified. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 13: Pavement drainage
MS 2526-13:2014
Status : Original
Format : PDF

This Malaysian Standard specifies drainage design and planning criteria for road or street pavement. The design criteria for drains and related appurtenances address safety concerns associated with th ....Read more e ponding of water on pavements which can be hazardous to vehicles using the road at speed. Close

RM 45.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 9: Bioretention Systems
MS 2526-9:2014
Status : Original
Format : PDF

This Malaysian Standard specifies the guideline and requirement for planning and development of bioretention system and describes methods of analysis, design and construction.

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 8: Infiltration facilities
MS 2526-8:2014
Status : Original
Format : PDF

This Malaysian Standard specifies criteria for the design of infiltration facilities. The Standard does not address the facilities that required in the industrial sites or other highly polluted urban ....Read more areas. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 6: Rainwater harvesting
MS 2526-6:2014
Status : Original
Format : PDF

This Malaysian Standard specifies design criteria for rainwater harvesting facilities for household or individual building use. Design requirements, mainly for storage tank and plumbing/piping, are sp ....Read more ecified. Safeguards against contamination as well as for public safety are also provided for. This is to ensure that the system complies with sustainability, water quality and design standard. Close

RM 30.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 2: Quantity design fundamentals
MS 2526-2:2012
Status : Original
Format : PDF

This Malaysian Standard specifies design and planning fundamentals to enable management of stormwater quantity. It deals with runoff quantity hydrology and hydraulics. It does not detail out design cr ....Read more iteria for specific facility types which are associated with stormwater quantity management. The details are as specified in Parts 4 to 7 and Parts 13 to 20 of these series of urban stormwater management standards. Close

RM 60.00

Document will be sent via email



 Add To Cart

Urban stormwater management - Part 3: Quality design fundamentals
MS 2526-3:2012
Status : Original
Format : PDF

This Malaysian Standard specifies design and planning fundamentals to enable management of stormwater quality on permanent basis. The standard deals with runoff pollutants, hydrology and hydraulic for ....Read more various land-uses and treatment objectives. The standard does not detail out design criteria for specific best management practices (BMP) types which are associated with stormwater quality management. The details are specified in Part 8 to 12 in the series of urban stormwater management standards. Close

RM 30.00

Document will be sent via email



 Add To Cart

  • ‹
  • 1
  • 2
  • ...
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • ...
  • 587
  • 588
  • ›
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.