• :  
BM ENG
  • Subscription
  • MS Catalogue
  • MS Pack
  • Purchase History
  • Cart
  • Hi
    !
    • My Profile
    • Portal
    • Log Out

Modal title

Widget settings form goes here
MS Preview
Close

MS 2526-19:2014
Urban stormwater management - Part 19: Gate and pump

This Malaysian Standard specifies design acceptance criteria for stormwater gates and pumping station facilities. It does not detail out criteria and required facilities which are associated with stormwater quantity and quality control management as well as the derivation of design flow hydrographs. These are specified in other parts.

Original
• (none)  / (none)  / (none)
PDF
14/04/2019
18
NSC 04 - Construction, Building, and Civil Engineering
93.025 
30.00
 Add To Cart