• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • signin
  •  Cart ()

MS Preview

MS 2015: PART 2:2006
PUBLIC TOILETS - PART 2: INSPECTION CRITERIA
This Malaysian Standard specifies the two types of inspection methods for public toilets which are inspection and daily checking system (DCS). These two methods of assessment apply to the design, cleanliness and facilities of public toilets. The purpose of this assessment is to specify a measuring system that determines the quality of design, facilities and cleanliness to objective conditions. The final inspections can be used as a tool to compare the obtained quality with the prescribed quality. The principal of the inspection and daily checking system are based on visual and physical assessment on the degree of absence of disorder in a sample of selected elements of the object (public toilets) to be inspected. This standard applies to the measurement of the quality of design, facilities and cleanliness in all types of public toilets. Elements can be inspected and checked objectively by comparing their state with the prescribed result, as normatively defined in the inspection cri
Published
N/A

PDF

04/04/2019
46
NSC 04 - Construction, Building, and Civil Engineering
03.080.30 
75.00

 Add To Cart
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.