Vitrified clay pipes and fittings and pipe joints for drains and sewers - Part 2: Quality control and sampling
(First revision)
This part of this Malaysian Standard specifies requirements for manufacturer’s internal quality control, third party assessment and inspection. It describes in detail, routine, regular, optional and evaluation tests. In addition, it includes procedures and switching rules for inspection by variables.
NOTE. Where reference is made to clauses in MS 1061-1 and MS 1061-2 it is clearly stated.
Published
PDF
06/10/2022
28
NSC 04 - Construction, Building, and Civil Engineering