• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • Sign In
  •  Cart ()

MS Preview

MS 1314-7:2011 (CONFIRMED:2015)
Precast concrete piles - Part 7: Installation of precast concrete piles - Requirements
This Malaysian Standard specifies the requirements for the installation of precast concrete piles complying to MS 1314 and covers the driven and jacked-in piles for civil engineering and building structures on land or immediate inshore locations. It does not extend to offshore (deepwater) construction.
Published
• (none)  / (none)  / (none)

PDF

02/08/2019
28
NSC 04 - Construction, Building, and Civil Engineering
93.020 
45.00

 Add To Cart
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.