• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • Sign In
  •  Cart ()

MS Preview

MS 2526-19:2014
Urban stormwater management - Part 19: Gate and pump
This Malaysian Standard specifies design acceptance criteria for stormwater gates and pumping station facilities. It does not detail out criteria and required facilities which are associated with stormwater quantity and quality control management as well as the derivation of design flow hydrographs. These are specified in other parts.
Published
• (none)  / (none)  / (none)

PDF

14/04/2019
18
NSC 04 - Construction, Building, and Civil Engineering
93.025 
30.00

 Add To Cart
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.