• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • Sign In
  •  Cart ()

MS Preview

MS 2526-1:2012
Urban stormwater management - Part 1: Design acceptance criteria
This Malaysian Standard specifies design acceptance criteria for all the prescribed stormwater management facilities. The design criteria specified for quantity control covers protection levels to be provided to various urban landuses and the limits allowable in stormwater flows. Design criteria for quality control specifies temporary facilities needed for control of pollutants (especially sediment) during construction and permanent facilities for control after construction. It does not detail out specific criteria for design of specific facility types which are associated with stormwater quantity or quality management. These specific design criteria are provided in Parts (4 to 20) of the series of urban stormwater management standards.
Published
• (none)  / (none)  / (none)

PDF

14/04/2019
27
NSC 04 - Construction, Building, and Civil Engineering
93.025 
45.00

 Add To Cart
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.