VITRIFIED CLAY PIPES AND FITTINGS AND PIPE JOINTS FOR DRAINS AND SEWERS
PART 3 : TEST METHODS
(FIRST REVISION)
This Malaysian Standard is the specification for the methods of test for requirements of MS 1061 : Part 1.
NOTE. Where reference is made to clauses in MS 1061: Part 1, it is clearly stated.
Throughout the clauses in this standard reference to pipes includes pipe sections as defined in clause 3.8 of MS 1061: Part I, where these are suitable and permitted for the tests.
Withdraw
New revision of MS 1061-3:2022 has been published which cancels and replace
PDF
27/02/2023
44
NSC 04 - Construction, Building, and Civil Engineering