Power transformers - Part 4: Guide to the lightning impulse and switching impulse testing - Power transformers and reactors (IEC 60076-4:2002, IDT)
This Malaysian Standard gives guidance and explanatory comments on the existing procedures for
lightning and switching impulse testing of power transformers to supplement the requirements of
IEC 60076-3. It is also generally applicable to the testing of reactors (see IEC 60289),
modifications to power transformer procedures being indicated where required.
Information is given on waveshapes, test circuits including test connections, earthing
practices, failure detection methods, test procedures, measuring techniques and interpretation
of results.
Where applicable, the test techniques are as recommended in IEC 60060-1 and IEC 60060-2.
Published
• (none) / (none) / (none)
PDF
06/05/2019
71
NSC 05 - Generation, Transmission & Distribution of Energy