• :  
BM ENG
  • Home
  • Service
  • International Standard
  • FAQ
  • Publish
  • Sign In
  •  Cart ()

MS Preview

MS 133 : PART C7 : 1997
METHODS OF TEST FOR PAINTS AND VARNISHES PART C7 : DETERMINATION OF DRYING TIME USING BK DRYING RECORDER (SURFACE DRY, TOUCH DRY AND HARD DRY)
1.1 This part of the Malaysian Standard specifies a method for determining the drying time (surface dry, touch dry and hard dry) of paints and varnishes using BK drying recorder. 1.2 This drying time recorder is designed for the provision of reliable data on the transitional stages of drying or curing of paints and varnished coatings without the need to monitor the process continuously. For conventional paint films these stages are described consecutively as follows: 1.2.1 The surface dry stage; 1.2.2 The touch dry or tack free stage; and 1.2.3 The hard dry stage when the film is just robust enough to withstand the scoring of a ball pointed needle. Reference should be made to MS 133: Part C3 which details method of recording hard drying times
Published
• (none) / (none) / (none)

PDF

27/06/2019
10
NSC 02 - Chemicals and Materials
87.04
15.00

 Add To Cart
©2020 All rights reserved
Department of Standards Malaysia (STANDARDS MALAYSIA). Best viewed on latest browser.